Tuesday, January 18, 2011

The Plan

Once we were mostly aware of the scope of the project we were undertaking we decided it was time to devise a plan.  Here is what we came up with:


  • The windows would all be replaced.
  • The original hardwoods would be refinished.
  • All wiring would be replaced as well as the sub-panel, receptacles, switches and light fixtures.
  • Plumbing issues would be dealt with as they arose.
  • The interior hollow core doors would be replaced with interior wood doors.
  • The main bathroom would be gutted.
  • The bedrooms would all be patched up and painted.
  • The master bath would be made slightly bigger and a custom shower would be built.
  • The kitchen would be gutted.
  • The wall dividing the den would be removed to enlarge the space.
  • The laundry room would be reconfigured to support the addition of a mop sink.
  • The half bath off the den would be reconfigured.
It looks like a short list, but it took a very long time to complete!